Setting up a new build construction site is crucial to any construction project, ensuring the build runs smoothly, safely, and on time. Proper construction planning saves time, reduces costs, and minimises health and safety issues. This guide will walk you through how to set up a new construction site.
1. Get Planning Permission and Approvals
Before starting any construction work:
- Planning permission: Submit your plans to the local authority for approval before the construction process.
- Building control: Work with building control to ensure your plans comply with building regulations.
- Obtain insurance certificates and other important documents to mitigate risks.
Ensure all contract documents and approvals are in place before moving forward.
2. Site Preparation
Site preparation is key to success. Tasks include:
- Clearing the building site of debris and vegetation.
- Marking out the site and setting up the foundation blockwork.
- Installing drainage systems, such as drainage exit lintels, to manage water flow.
- Allocating space for welfare facilities for construction workers and storage for materials.
Portable toilets are a critical part of welfare facilities, ensuring that construction workers have access to clean and convenient sanitary facilities on-site. This is essential for maintaining hygiene and compliance with health and safety regulations. For portable toilets, visit Portable Toilets LTD.
For self-build or larger projects, allow access for heavy machinery and create a project schedule to coordinate tasks.
3. Develop a Construction Phase Plan
Create a detailed construction phase plan to manage the construction activities. This should include:
- Risk assessments and method statements for all high-risk activities, such as working with hazardous substances or in confined spaces.
- A safety plan, including protocols for wearing hard hats, dust masks, and safety boots.
- Assigning responsibilities to the project manager and team leaders.
- Scheduling key tasks, such as building construction, electrical work, and interior finishes.
4. Lay the Foundations
The first major task in the construction phase is to lay the foundations:
- Install a damp proof course to prevent moisture issues.
- Use concrete floor beams and infill blocks to create a stable base for the next stage.
The site is now ready to build.
5. Structural Work
Once the foundations are complete, move on to structural work:
- Build exterior walls using energy-efficient materials, such as timber frames, for new build homes.
- Install first floor beams and prepare structural openings for doors and windows.
- Set up underfloor heating and complete the first fix plumbing.
6. First Fix
In this phase, focus on the internal systems:
- Complete first fix plumbing, including water and gas pipes.
- Run cables for electrical work, such as light fixtures, sockets, and switches.
- Install internal walls and supports, including plasterboard noggins.
Record all work in training records to comply with health and safety standards.
7. Floors, Walls, and Windows
Next, work on the framework and finishes:
- Install and seal internal doors and window frames.
- Complete the exterior walls and begin the internal walls.
- Ensure all areas are accessible and safe for the second fix carpentry stage.
8. Second Fix Carpentry and Interior Finishes
This is where the house starts to feel liveable:
- Install light fixtures, towel rails, and room thermostats.
- Fit internal doors, skirting boards, and joinery.
- Connect the heating systems, including radiators and boilers, for a fully functional system.
9. External Work and Landscaping
While the interior is being completed, focus on external tasks:
- Build retaining walls and ensure drainage systems are fully operational.
- Complete paths, driveways, and landscaping to enhance the property.
- Add external lighting for safety and usability.
10. Final Stage and Sign-Off
The final stage focuses on finishing and compliance:
- Test all systems, including plumbing, heating, and electrics.
- Inspect the property with building control to ensure compliance with building regulations.
- Ensure all important documents, such as warranties and insurance documents, are in place.
- Clean and seal the new build, both internally and externally, ready for occupation.
Conclusion
Setting up a new construction site requires careful construction planning, strict compliance with regulations, and a strong focus on safety. From risk assessments method statements to second fix carpentry and landscaping, every stage of the new construction project plays an essential role in delivering a high-quality home. By following this guide, you can ensure the planning process and execution of your project scope run efficiently, resulting in a successful build.
Also Read: